Completion and Production

This group is often missed and may result in a costly error if their needs are not considered in the planning phase. They usually share some of the planning responsibility with the geology department.

  • Location of surface facilities or ability to move existing when infill drilling on an existing pad
  • Type of completion required (frac, pump rods)
  • May specify maximum inclination and dogleg limits based upon log and production requirements
  • Enhanced recovery completion requirements
  • Wellbore positioning requirements for future drainage/production plans
  • Downhole temperature and pressure