1.11.1 Diverters-KFDJ

Operating parameters is typically 750 psi closing pressure through 1-inch ID lines with a maximum wellbore pressure of 500 psi. Closing time is less than 10 seconds. Overboard lines should be as straight as possible in configuration to minimise erosion during diverting. Diverters can be connected directly to the conductor or drive-pipe or attached above the BOPs. On floating rigs the diverter is used to prevent trapped gas from reaching the rig floor after a kill operation.

Outer Packer

Flowline/Vent Outlets

Rotary Table

Test Tool

Handling Tool

Outer Packer

Flowline/Vent Outlets

Diverter Insert

Diverter Assembly

Insert Packer

Fill-up Line

Test Tool

Figure 32 - KFDJ Diverter

Diverter Assembly

Insert Packer

Fill-up Line

Figure 32 - KFDJ Diverter

□ rillinq S Well Services Trai n in g

On manually operated systems the proper sequence for diverting is as follows:

• Open overboard line valve down wind of the rig; close shaker line valve and then close diverter.

Automated systems combine the actions listed above in one simultaneous function. With these systems the appropriate (downwind) vent valve should be selected prior to diverting.

In the past diverters have failed due to control system faults, human error, eroded and ruptured vent lines and blocked or plugged vent line valves. An important consideration is the proper maintenance and testing of the diverter system at regular intervals. Vent lines should be flushed and vent line valves should be function tested to ensure proper operation.

Open Close

Diverter Packer

Open Close

Overboard Vent

PORT SIDE

Flowline to Shale Shaker

Diverter Packer

Open Close

Overboard Vent

Open Close

Shale Shaker Mud Pit

Flowline Seals

Energise Vent

Energise Vent

Open Close

Full Opening Valve w/Hydraulic Operator

Overshot Packer

Flowline Seals

Energise Vent

Open Close verboard Vent

Open Close

STARBOARD SIDE

Energise Vent

Overshot Packer

Figure 33 - KFDJ Hydraulic Functions

Diverter Hook-Ups - KFDJ

Overshot For Drill Pipe

Drive Pipe Hook-Up

Conductor Pipe Hook-Up

Optional Conductor Pipe Hook-Up

Surface Pipe Hook-Up

Figure 34 - Typical Drilling Operation Sequence

1.11.3 Diverters - MSP

Piston Indicator

Piston Indicator

Well Control Valves And Diverters

Packing Unit

Opening Chamber Head

Latching Mechanism

Opening Chamber Piston

Closing Chamber

Figure 35 - Hydril MSP Diverter

Packing Unit

Opening Chamber Head

Latching Mechanism

Opening Chamber Piston

Closing Chamber

Figure 35 - Hydril MSP Diverter

1.11.4 Hydril MSP 29 Y2" 500 psi Diverter

The MSP 500 permits open hole to be drilled full bore with diverter protection. It also permits the setting of large sized surface casing without removing the diverter. Thus the diverter is always ready for venting gas flows. The new design employs fewer parts and weighs less while at the same time decreasing the risk of malfunction. When using the MSP as a diverter during top-hole drilling, the primary purpose is to divert well flows away from the rig and personnel. This application avoids shutting in the well, but instead permits routing of the flow to a safe distance on the down wind side of the rig. Seal off is affected by hydraulic pressure applied to the closing chamber, which raises the piston unit radially inward into a sealing engagement. The MSP 500 however, is not well pressure assisted. If valves are to be added to the vent lines it is recommended they be full opening and designed to automatically open when the diverter is closed. This can be accomplished by using the closing pressure of the diverter as the pilot pressure for the valve, i.e., as closing pressure is applied to the diverter that same pressure causes the valve to open, thus assuring that there is no large well bore back-pressure build up.

Flow Line

Hydraulic Power Fluid Supply

Close Open i

Flow Line

Hydril Diverter With Valve

Bell Nipple

Figure 36 — MSP Diverter Functions

Bell Nipple

Full Opening Valve (Automatically Opens Before Diverter is Closed)

Drive or

Conductor Pipe

Drilling Spool

Figure 36 — MSP Diverter Functions

1.11.5 Diverters

A diverter is a safety system, which reroutes a well fluid flow away from the rig. Shallow gas is permitted to flow until depleted, or until the well is bridged over or killed by pumping in heavy mud. Ready during upper hole operations, a diverter is intended for use when there is a danger of penetrating a pressurised gas zone, while the casing shoe strength may not be sufficient to contain shut in pressures. Massive flows of gas and sand can quickly destroy a rig's diverter system. Hydril incorporate integral valve functions and switchable target to minimise equipment and thereby decrease the risk of malfunction. Upward motion of one component, the piston, stops upward flow of the well fluid and opens the vent line. All that is required is one hydraulic signal from the remote panel, and since there is no waiting on valve functions a fast response is ensured.

Surface Drilling Diverters Drawings

Figure 37 - Surface Rig Diverting fo M k

Figure 37 - Surface Rig Diverting

Hydril diverter with integral valve functions and switchable target

Shale shaker

Hydril Diverter

Starboard vent

Always open flow selector

Port vent

Starboard vent

Always open flow selector

Port vent

Shale shaker

Sequential diverter system

Shale shaker

Offshore Drilling Rig Degasser

Starboard vent

Port vent

Flow target

Port vent

Flow target

Valve function:

  1. Diverter valve
  2. Flowline valve
  3. Block valve
  4. Port vent valve
  5. Starboard vent vdve

Starboard vent

Figure 38 - Integral vs. Sequential Diverter Systems

Was this article helpful?

+1 0
Body Language Mastery

Body Language Mastery

Master The Arts Of Reading Body Language. Get Powerful Messages Across With Ease And Make People Listen To Your Every Word With This One Of A Kind Guide To Effective Body Language! These Hidden Communication Techniques Will Help You Get Important Messages Across To Your Audiences Fast And Help You Achieve Your Desired Results With Ease!

Get My Free Ebook


Responses

  • carmen
    How do you test the vent lines on a diverter system?
    9 years ago
  • Milo Gamgee
    Does the kfdj diverter have an opening and closing line?
    7 years ago
  • SAMUEL
    HOW MUCH PRESSURE DO YOU TEST DIVERTER IN OIL FIELD?
    3 months ago